Case studies
Club Natació Barcelona
For the purpose of heating the water in the Olympic swimming pool, indoor pools, and shower rooms at Club Natació Barcelona, 1041 PVT panels have been installed. The energy generated is used to meet the electrical needs of the sports complex..